What does this quality measure capture?
This measure tracks due-date performance for corrective and preventive actions. It answers whether actions in a due-date cohort were closed on time, not whether the investigation was complete, the solution addressed the cause, or effectiveness checks showed that recurrence was prevented.
The date cohort should be based on effective due dates, not merely the month an action was opened or the month it was closed. That convention keeps the numerator and denominator tied to the same group of obligations.
Define the cohort and units
Enter whole actions closed on or before the due date and whole actions due in the cohort. The due count must be positive; on-time closures cannot exceed it. Include only actions with a due date inside the selected cohort.
Actions still open after their due dates are not on-time closures, so they remain in the denominator and do not enter the numerator as successes. A future-due action is not yet part of the due cohort.
Formula and worked example
The rate is actions closed on or before the effective due date divided by all CAPA actions due in the cohort, multiplied by 100. The calculator also returns the count of due actions not closed on time.
If 18 of 24 actions due in the cohort were closed by their due dates, the rate is 18/24×100=75%. The remaining six were late or not yet closed when the cohort was measured.
Interpret the displayed result
If 42 of 50 due actions were closed on time, the rate is 84%, with eight not on-time. The result is a schedule metric; it cannot distinguish a minor documentation delay from a high-risk action that remains incomplete.
The calculator displays the percentage to two decimals. Do not change historical due dates retroactively without retaining the approved extension and the original commitment, or the rate may no longer describe the schedule actually managed.
Assumptions and limits
FDA’s corrective-action procedure emphasizes documented investigation, implementation, review, and effectiveness verification. A timely closure can still be ineffective, while an effective action may be late; maintain separate measures for quality and timing.
Interpret trends with action risk, complexity, owner workload, extension approvals, and verification status. A higher on-time rate is not automatically better if actions are closed before evidence supports their effectiveness.
Keep the result reproducible
Define how approved extensions affect the effective due date, how overdue open actions are handled, and which action types are included. A denominator that changes after each review can make period-to-period rates difficult to compare.
Report both the cohort period and the date on which status was frozen. If late records are backfilled after the reporting cut, preserve the original snapshot and show the revision instead of silently rewriting the historical rate. This keeps trend comparisons auditable when due dates or closure evidence are updated.
Keep action IDs, original and approved due dates, closure evidence, and effectiveness-check status with the cohort. the CAPA on-time closure calculator calculates due-date performance, not the adequacy of a corrective action.
Worked examples
The examples use actions due in their respective cohorts, including open or late cases in the denominator. Compare each due-date snapshot with its own approved schedule history.
Twenty-four actions due
Inputs: 18 closed on or before due date; 24 actions due
Calculation: Rate=18/24×100=75%; not on time=24−18=6
Three quarters of the due cohort met the date rule. Six actions were late or remained open at the observation point.
A stronger on-time cohort
Inputs: 42 on-time closures; 50 actions due
Calculation: Rate=42/50×100=84%; not on time=8
The cohort rate is 84%. It does not verify whether the actions prevented recurrence or met effectiveness criteria.