What the measure includes
Attainment is booked value divided by the full period quota. The straight-line projection extends current booked pace across all working days; remaining daily need divides the unbooked quota by remaining days.
A straight-line run rate assumes even pacing, but sales close unevenly and may be credited after a contract or collection event. The projection is a scenario, not a forecast based on deal probabilities.
Straight-line projection assumes bookings arrive evenly across working days. Sales often cluster near period end; holidays, approvals, territory coverage, and contract timing can cause a linear pace to overstate or understate the finish.
Choose inputs that match
Enter quota, booked amount to date, elapsed working days, and total working days in the period. Exclude weekends or holidays consistently if your sales calendar does; elapsed days must be positive.
Attainment divides bookings by full-period quota; daily need uses the unbooked gap and remaining days. If bookings already exceed quota, the formula floors daily need at zero and does not model cancellations.
Follow the calculation
Attainment = booked÷quota; projection = booked×total days÷elapsed days; daily need = max(0, quota−booked)÷days remaining. If no days remain, no daily target is produced.
The source output reports attainment, straight-line projection, and the needed daily amount. Quota and bookings are nonnegative; the selected period must be at least as long as elapsed time.
Use one working-day calendar and quota-credit rule for every input. A stage-weighted forecast is a separate method and can sit alongside this pace estimate, but should not be substituted for its linear projection.
Interpret the result
Compare the projection with quota to understand current pace, then look at the daily amount still needed. If booked already exceeds quota, remaining need is zero under the formula even though future cancellations could change credit.
Use the estimate for pacing conversations and capacity planning, alongside open deals and the team’s historical close pattern. A lumpy quarter can be far ahead or behind a straight line before the final outcomes settle.
Keep the same holiday calendar and definition of a working day in the elapsed and total counts so the pace projection compares like periods.
Limits and practical checks
Salesforce quota-attainment guidance defines attainment against quota and discusses the use of forecast data. This calculator’s projection is purely linear and does not assess opportunity stages, cancellations, or crediting rules.
Record whether bookings are measured in contract value, ARR, or recognized revenue. A pace number can be mathematically correct and still disagree with the company’s quota-crediting policy.
The projection excludes open pipeline and assumes each working day contributes evenly. Confirm booked value follows the quota-credit rule, especially for multi-year contracts, split credit, and deals credited only after a later event.
Worked examples
Each example separates booked-to-date attainment, a straight-line projection, and the amount required per remaining working day.
Worked example 1: booked pace and remaining-day need
Inputs: Quota $250,000.00; booked $92,000.00; elapsed 12 of 22 working days.
Calculation: Attainment = 36.8000%; straight-line projection = $92,000.00 × 22 ÷ 12 = $168,666.67; remaining daily need = max(0, $158,000.00) ÷ 10 = $15,800.00/day.
The team is at 36.8000% attainment; the linear projection is below quota, and the remaining ten working days require $15,800 per day.
Worked example 2: booked pace and remaining-day need
Inputs: Quota $180,000.00; booked $95,000.00; elapsed 15 of 20 working days.
Calculation: Attainment = 52.7778%; straight-line projection = $95,000.00 × 20 ÷ 15 = $126,666.67; remaining daily need = max(0, $85,000.00) ÷ 5 = $17,000.00/day.
At 52.7778% attainment, the projection remains below quota and the five remaining working days require $17,000 each to reach it.