How to use this calculator
Apply the ideal earliest-deadline-first utilization test to independent periodic tasks with deadlines equal to periods.
- Enter Worst-case execution times, Task periods and relative deadlines. Match the units shown beside each field and review the result together with the assumptions below.
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
EDF periodic task utilization test explained
For independent periodic jobs on one preemptive processor, implicit deadlines equal to each task period have a simple EDF feasibility test: total execution-time utilization must not exceed one. This check does not cover constrained deadlines or scheduling overhead.
Inputs, symbols, and units
c— Worst-case execution times- Worst-case execution times. Enter comma-separated execution times Cᵢ in the same order as the periods.
t— Task periods and relative deadlines- Task periods and relative deadlines. Enter comma-separated execution times Cᵢ in the same order as the periods.
Formula and method
U = Σ(Cᵢ/Tᵢ). For independent periodic tasks with relative deadline Dᵢ=Tᵢ on one ideal preemptive processor, the EDF test passes when U ≤ 1.
Single preemptive processor, zero scheduling overhead, no blocking, and each relative deadline equals its period; constrained deadlines need another schedulability test.
A worked scenario
Worst-case execution times = 1, 2, 1; Task periods and relative deadlines = 4, 5, 10.
- Total task utilization: 0.75
- Ideal EDF test: Pass under stated assumptions
For (Cᵢ,Tᵢ)=(1,4),(2,5),(1,10), U=1/4+2/5+1/10=0.75, so the ideal implicit-deadline EDF test passes.
Assumptions and edge cases
Single preemptive processor, zero scheduling overhead, no blocking, and deadline=period for every task.
Frequently asked questions
Is utilization ≤1 sufficient here?
Yes under the stated ideal assumptions.
Can deadlines be shorter than periods?
Not with this simple test.
Does it model multicore scheduling?
No.
How do I use the EDF periodic task utilization test calculator?
Enter Worst-case execution times, Task periods and relative deadlines. Match the units shown beside each field and review the result together with the assumptions below.
What is a worked example of EDF periodic task utilization test?
Worst-case execution times = 1, 2, 1; Task periods and relative deadlines = 4, 5, 10. Total task utilization: 0.75 Ideal EDF test: Pass under stated assumptions For (Cᵢ,Tᵢ)=(1,4),(2,5),(1,10), U=1/4+2/5+1/10=0.75, so the ideal implicit-deadline EDF test passes.
Read our calculation methodology.