How to use this calculator
Integrate a segmented inrush pulse and compare its I²t against an explicitly supplied fuse pulse allowance.
- Enter Piecewise-constant pulse currents (A), Segment durations (s), Allowed pulse integral (A2 s). Match the units shown beside each field and review the result together with the assumptions below.
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
Fuse pulse melting-integral budget explained
Sum current squared times each pulse-segment duration, then compare the result with the derated I²t allowance.
How the calculation works
I²t_PULSE=Σ I_k² Δt_k; utilization=I²t_PULSE/I²t_ALLOWED.
Adjacent segments approximate the measured waveform. Enter an allowable integral suitable for the pulse count and operating temperature; a nominal melting integral is not automatically a repetitive-pulse allowance.
Set up the calculation
currents— Piecewise-constant pulse currents (A)- Current magnitude or signed current in each adjacent pulse segment. Use comma-separated values in the stated order.
times— Segment durations (s)- Duration paired by position with each current. Use comma-separated values in the stated order.
rating— Allowed pulse integral (A2 s)- Application-specific permissible I²t after required manufacturer derating.
Limits of this model
Adiabatic pulse comparison only; cooling between pulses, arcing I²t, time-current curves and cumulative fatigue require manufacturer guidance.
Check this example
Piecewise-constant pulse currents (A) = 10,30,10; Segment durations (s) = 0.01,0.002,0.01; Allowed pulse integral (A2 s) = 10.
- Pulse I squared t: 3.8 A2 s
- Allowed-integral utilization: 38 %
- Total pulse duration: 0.022 s
Two 10 A, 10 ms shoulders around a 30 A, 2 ms peak produce 3.8 A²s, using 38% of a 10 A²s entered allowance.
Reading the outputs
The integral is polarity-independent. Utilization measures the entered budget, not a certified pass/fail fuse selection.
Frequently asked questions
Can I use current signs?
Yes; squaring makes positive and negative current contribute equally.
Can several pulses be summed across long pauses?
Not without a thermal-recovery model; this list represents one contiguous event.
Is nominal melting I²t an allowable repetitive pulse?
Usually a separate derating or pulse-withstand rule is needed for repeated events.
How do I use the Fuse pulse melting-integral budget calculator?
Enter Piecewise-constant pulse currents (A), Segment durations (s), Allowed pulse integral (A2 s). Match the units shown beside each field and review the result together with the assumptions below.
What is a worked example of Fuse pulse melting-integral budget?
Piecewise-constant pulse currents (A) = 10,30,10; Segment durations (s) = 0.01,0.002,0.01; Allowed pulse integral (A2 s) = 10. Pulse I squared t: 3.8 A2 s Allowed-integral utilization: 38 % Total pulse duration: 0.022 s Two 10 A, 10 ms shoulders around a 30 A, 2 ms peak produce 3.8 A²s, using 38% of a 10 A²s entered allowance.
Background or definition reference: Littelfuse Fuseology Design Guide: melting integral.
Read our calculation methodology.