CalcWorldHub
Free online calculator · no signup

Normal lead demand unit fill rate calculator

Estimate the unit fill rate of a continuous-review (Q,r) model from the normal loss function.

4,000 tools
Normal lead demand unit fill rate calculator — Mean lead-time demand (units), Lead-time demand standard deviation (units), Reorder point (units) and calculation method
Normal lead demand unit fill rate calculator: inputs and calculation method.

How to use this calculator

Estimate the unit fill rate of a continuous-review (Q,r) model from the normal loss function.

  1. Enter Mean lead-time demand (units), Lead-time demand standard deviation (units), Reorder point (units), Order quantity (units). Match the units shown beside each field and review the result together with the assumptions below.
  2. Read the worked example below to check the expected input format and result.
  3. Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
Calculation guide

Normal lead demand unit fill rate explained

This approximation estimates the expected share of reorder demand filled immediately from normal lead-time demand and the order quantity. It is a unit fill rate, not the probability of avoiding a stockout; mean, deviation, reorder point, and order quantity must describe the same lead-time period.

Approximate immediate unit fill rate0.9833
With reorder point 120, mean 100, deviation 20, and order quantity 100, expected shortage is about 1.6663 units per cycle.

How the calculation works

1−normal expected shortage / order quantity

Expected fill rate = 1 − E[(D − r)⁺]/Q, where D is normal lead-time demand, r is the reorder point, and Q is order quantity. The normal tail is an approximation; the model rejects an expected shortage greater than Q.

Set up the calculation

m — Mean lead-time demand (units)
Mean lead-time demand (units).
s — Lead-time demand standard deviation (units)
Lead-time demand standard deviation (units).
r — Reorder point (units)
Reorder point (units).
q — Order quantity (units)
Order quantity (units).

Limits of this model

Normally distributed lead demand and conventional expected-shortage approximation; negative modeled inventory values and shortage behavior require practical interpretation.

Check this example

Mean lead-time demand (units) = 100; Lead-time demand standard deviation (units) = 20; Reorder point (units) = 120; Order quantity (units) = 100.

  • Approximate immediate unit fill rate: 0.98333691
  • Expected shortage per cycle: 1.666309 units

This scenario uses the stated units and assumptions. Displayed values are rounded only after calculation.

Frequently asked questions

Is this the probability of no stockout?

No, it measures expected fraction of demand filled immediately.

Why include order quantity?

Expected shortage per cycle is compared with Q.

Can this return a negative raw fill estimate?

If the approximation exceeds Q, the inputs are outside this useful fill-rate model and are rejected.

How do I use the Normal lead demand unit fill rate calculator?

Enter Mean lead-time demand (units), Lead-time demand standard deviation (units), Reorder point (units), Order quantity (units). Match the units shown beside each field and review the result together with the assumptions below.

What is a worked example of Normal lead demand unit fill rate?

Mean lead-time demand (units) = 100; Lead-time demand standard deviation (units) = 20; Reorder point (units) = 120; Order quantity (units) = 100. Approximate immediate unit fill rate: 0.98333691 Expected shortage per cycle: 1.666309 units This scenario uses the stated units and assumptions. Displayed values are rounded only after calculation.