Measure what share of ordered product lines were fulfilled completely on the first shipment.
- Enter Order lines fulfilled completely, Total order lines. Match the units shown beside each field and review the result together with the assumptions below.
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
How this calculation works
Line fill rate counts an order line as filled only when its requested quantity is supplied in full under the chosen shipping rule. Divide fully filled lines by total order lines in the same order cohort to track completeness rather than item volume.
Inputs and units
filled— Order lines fulfilled completely- Lines supplied in full under the chosen fulfillment rule.
total— Total order lines- All order lines in the same cohort.
Formula
Order line fill rate (%) = fully filled order lines ÷ total order lines × 100.
Worked example
If 940 of 1,000 order lines were fulfilled completely, line fill rate is 940 ÷ 1,000 × 100 = 94%.
Assumptions and limits
Does not measure units filled, on-time delivery, order accuracy, or customer satisfaction. Unit fill rate and perfect-order rate answer different questions.
Frequently asked questions
How is line fill rate different from unit fill rate?
Line fill rate counts a line only if its full requested quantity was supplied; unit fill rate counts fulfilled units against units requested.
How should split shipments count?
Define whether a line is complete only after all pieces arrive, then use that rule consistently.
Does it include delivery timing?
No. This measure covers completeness, not whether fulfillment was on time.
How do I use the Order line fill rate calculator?
Enter Order lines fulfilled completely, Total order lines. Match the units shown beside each field and review the result together with the assumptions below.
What is a worked example of Order line fill rate?
If 940 of 1,000 order lines were fulfilled completely, line fill rate is 940 ÷ 1,000 × 100 = 94%.