Preventive Maintenance On-Time Compliance Rate Calculator

Measure scheduled maintenance work orders completed by their due date in a defined period.

4,000 tools
Preventive Maintenance On-Time Compliance Rate Calculator — Work orders completed by due date, Eligible work orders due and calculation method
Preventive Maintenance On-Time Compliance Rate Calculator: inputs and calculation method.

How to use this calculator

Measure scheduled maintenance work orders completed by their due date in a defined period.

  1. Enter Work orders completed by due date, Eligible work orders due. Match the units shown beside each field and review the result together with the assumptions below.
  2. Read the worked example below to check the expected input format and result.
  3. Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
Manufacturing calculation

How this calculation works

Enter work orders due in the cohort and those completed on or before their due date. Results show on-time compliance and the count not completed by due date. Use matching sites, priorities, and due-date rules.

Inputs and units

completedOnTime — Work orders completed by due date
Eligible preventive work orders closed on or before their due date.
workOrdersDue — Eligible work orders due
Work orders due in the same period and policy cohort.

Formula

Displayed formula

On-time preventive maintenance compliance (%) = work orders completed by due date ÷ work orders due × 100.

Method

Divide scheduled work orders completed by their due date by all eligible work orders due in the selected period.

Worked example

If 460 of 500 preventive work orders due are completed on time, compliance is 92.00%.

Assumptions and limits

Define rescheduled, cancelled, deferred, and emergency orders consistently. This measures schedule adherence, not asset reliability or maintenance effectiveness.

Frequently asked questions

Do overdue work orders count as on time?

No. They are outside the numerator even if completed later.

Should rescheduled work be included?

Apply the same approved rescheduling and due-date policy in every period.

Does high compliance prove reliability?

No. It measures schedule adherence, not technical effectiveness.

How do I use the Preventive Maintenance On-Time Compliance Rate Calculator?

Enter Work orders completed by due date, Eligible work orders due. Match the units shown beside each field and review the result together with the assumptions below.

What is a worked example of Preventive Maintenance On-Time Compliance Rate?

If 460 of 500 preventive work orders due are completed on time, compliance is 92.00%.