Safety stock with variable lead time calculator
This model combines variation in daily demand with variation in supplier lead time. It reports the buffer above expected demand during average lead time.
inputs.
Calculator
How to use this calculator
Estimate a whole-unit safety-stock buffer from demand variation, lead-time variation, average lead time, and a service z-score.
- Service-level z-score Average daily demand (units/day) Daily demand standard deviation (units) Average supplier lead time (days) Lead-time standard deviation (days)
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
Safety stock with variable lead time calculator
This model combines variation in daily demand with variation in supplier lead time. It reports the buffer above expected demand during average lead time.
Inputs and units
- Service-level z-score
- Average daily demand (units/day)
- Daily demand standard deviation (units)
- Average supplier lead time (days)
- Lead-time standard deviation (days)
Formula and method
Formula: SS = z × √(Lσd² + d²σL²), where d is mean daily demand, σd its standard deviation, L mean lead time, and σL lead-time standard deviation.
Worked example
For z=1.65, d=20 units/day, σd=8, L=12 days, and σL=2 days: variance=12×64+400×4=2,368; SS=1.65√2,368≈80.29, rounded up to 81 units.
Interpreting the result
A larger z-score, demand variability, or lead-time variability raises the buffer. The z-score represents the chosen service-level assumption, not a universal service guarantee.
Assumptions and limits
The formula assumes independent demand and lead-time variation and a simplified distribution model. Correlation, seasonality, forecast error, supplier disruptions, and review policy can change required stock.
Sources and method notes
- The paper discusses lead-time demand variance and warns that simplified independence assumptions can understate stock needs when forecast errors are correlated. Cardiff University research: safety-stock calculations
Frequently asked questions
Why round up to a whole unit?
Safety stock is a physical count, so the estimate rounds a fractional buffer upward.
Does the result include expected demand during lead time?
No. It is the buffer component; a reorder point also includes expected lead-time demand.
How do I use the Safety stock with variable lead time calculator?
Service-level z-score Average daily demand (units/day) Daily demand standard deviation (units) Average supplier lead time (days) Lead-time standard deviation (days)
What is a worked example of Safety stock with variable lead time?
For z=1.65, d=20 units/day, σd=8, L=12 days, and σL=2 days: variance=12×64+400×4=2,368; SS=1.65√2,368≈80.29, rounded up to 81 units.
What does the Safety stock with variable lead time calculator calculate?
Estimate a whole-unit safety-stock buffer from demand variation, lead-time variation, average lead time, and a service z-score.
See the calculation methodology.
Good calculators show their work.
CalcWorldHub is built around clear inputs and visible assumptions. Results are estimates for planning; check official sources or your provider’s terms when exact figures matter.