How to use this calculator
Estimate target-sensitive process capability by penalizing both dispersion and mean departure from the engineering target.
- Enter Upper specification limit, Lower specification limit, Process standard deviation, Process mean, then complete the remaining labeled fields. Match the units shown beside each field and review the result together with the assumptions below.
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
Taguchi process capability Cpm explained
A numerical walkthrough
Upper specification limit = 110; Lower specification limit = 90; Process standard deviation = 3; Process mean = 101; Engineering target = 100.
- Taguchi Cpm: 1.05409255
The model behind the numbers
(u-l)/(6*sqrt(s*s+(m-t)**2))
Use a stable process and a suitable standard-deviation estimate.
What to enter
u— Upper specification limit- Upper specification limit.
l— Lower specification limit- Lower specification limit.
s— Process standard deviation- Process standard deviation.
m— Process mean- Process mean.
t— Engineering target- Engineering target.
Interpreting the result
Use a stable process and a suitable standard-deviation estimate. The index alone does not validate normality, stability, measurement quality, or acceptance criteria.
Frequently asked questions
How is Cpm different from Cp?
Cpm includes squared mean-to-target bias in its denominator.
Must the target equal the specification midpoint?
No, enter the actual engineering target.
Is this a percentage conforming?
No, it is a dimensionless capability index.
How do I use the Taguchi process capability Cpm calculator?
Enter Upper specification limit, Lower specification limit, Process standard deviation, Process mean, then complete the remaining labeled fields. Match the units shown beside each field and review the result together with the assumptions below.
What is a worked example of Taguchi process capability Cpm?
Upper specification limit = 110; Lower specification limit = 90; Process standard deviation = 3; Process mean = 101; Engineering target = 100. Taguchi Cpm: 1.05409255
Read our calculation methodology.
NIST gives the Cpm definition and notes normality and sample-size conditions for capability-index estimates. Source: NIST/SEMATECH Engineering Statistics Handbook: Process Capability.