How to use this calculator
Estimate deposited weld-metal mass and required filler wire from bead geometry and total weld length.
- Enter Weld bead cross-sectional area (mm²), Total weld length (m), Filler metal density (kg/m³), Deposition efficiency (%), then complete the remaining labeled fields. Match the units shown beside each field and review the result together with the assumptions below.
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
Weld filler metal mass from bead section length and deposition efficiency explained
Convert bead cross-section and weld length into deposited mass, then account for process deposition efficiency and the selected ordering allowance.
How the calculation works
M_deposited = (bead area × 10⁻⁶) × length × density; M_wire = M_deposited ÷ (efficiency/100); M_order = M_wire × (1 + allowance/100).
Convert cross-section from mm² to m² before multiplying by weld length and density. Add the chosen allowance after correcting for process efficiency.
Sources
- ISO 2401:2018 — Covered electrode efficiency, metal recovery, and deposition coefficient — Defines standardized measurement of covered-electrode efficiency and metal recovery; entered process efficiency is not a universal constant.
Inputs and units
area— Weld bead cross-sectional area (mm²)- Approximate deposited cross-sectional area per unit length.
length— Total weld length (m)- Combined bead length for the batch.
density— Filler metal density (kg/m³)- Density of the selected filler alloy.
eff— Deposition efficiency (%)- Fraction of supplied filler wire deposited in the joint.
allow— Extra wire allowance (%)- Allowance for starts, stops, and unused ends.
Limits of this model
One representative bead area and density are assumed. Joint qualification, weld size design, process losses, and code requirements are outside this material estimate.
Check this example
Weld bead cross-sectional area (mm²) = 22; Total weld length (m) = 14; Filler metal density (kg/m³) = 7850; Deposition efficiency (%) = 88; Extra wire allowance (%) = 10.
- Deposited weld metal: 2.4178 kg
- Wire required before allowance: 2.7475 kg
- Wire with allowance: 3.02225 kg
A 22 mm² bead over 14 m at 7,850 kg/m³ deposits about 2.42 kg; at 88% efficiency and 10% allowance, plan about 3.02 kg of wire.
Reading the outputs
The main result is welding wire mass with allowance; supporting outputs are labeled with their own units. Use the units shown beside each input and result.
Frequently asked questions
What does the weld filler metal mass from bead section length and deposition efficiency calculate?
A 22 mm² bead over 14 m at 7,850 kg/m³ deposits about 2.42 kg; at 88% efficiency and 10% allowance, plan about 3.02 kg of wire.
Which inputs most affect welding wire mass with allowance?
Convert cross-section from mm² to m² before multiplying by weld length and density. Add the chosen allowance after correcting for process efficiency.
Can this result replace a site-specific or measured value?
One representative bead area and density are assumed. Joint qualification, weld size design, process losses, and code requirements are outside this material estimate.
How do I use the Weld filler metal mass from bead section length and deposition efficiency calculator?
Enter Weld bead cross-sectional area (mm²), Total weld length (m), Filler metal density (kg/m³), Deposition efficiency (%), then complete the remaining labeled fields. Match the units shown beside each field and review the result together with the assumptions below.
What is a worked example of Weld filler metal mass from bead section length and deposition efficiency?
Weld bead cross-sectional area (mm²) = 22; Total weld length (m) = 14; Filler metal density (kg/m³) = 7850; Deposition efficiency (%) = 88; Extra wire allowance (%) = 10. Deposited weld metal: 2.4178 kg Wire required before allowance: 2.7475 kg Wire with allowance: 3.02225 kg A 22 mm² bead over 14 m at 7,850 kg/m³ deposits about 2.42 kg; at 88% efficiency and 10% allowance, plan about 3.02 kg of wire.