What the annual-value ranking measures
For item i, annual usage value is qi × ci, where qi is the quantity used over the year and ci is the unit cost in a consistent currency. The measure combines volume and cost: a low-volume component can rank highly if each unit is expensive, while a cheap fast-moving supply can also be important. The calculator adds those item values and orders them from largest to smallest before calculating cumulative shares.
This ranking is an attention rule, not a risk score: it does not measure stockout impact, supplier lead time, obsolescence, or customer criticality. Pair it with those factors before changing controls.
Prepare matched quantities, costs, and thresholds
Enter one annual quantity for every unit cost, keeping both lists in the same item order. If the source report contains monthly consumption, sum the twelve comparable months first; do not pair one month of demand with a full-year value. Use the same currency basis for all costs. The calculator accepts zero quantities or costs, but the combined annual usage value must be positive so cumulative percentages have a denominator.
The A and B fields are cumulative cutoffs written as percentages from 0 to 100, with A no greater than B. A common illustration uses 80% and 95%, but those values are policy choices rather than universal inventory laws. Use thresholds approved for the operation, and document the source date, valuation basis, and item identifiers beside the result so a later review can reproduce the list.
Read cumulative shares at the item boundary
After sorting, the calculator adds one item's annual value at a time and compares the resulting post-item cumulative share with the two entered thresholds. An item stays in A only when the cumulative share after including it is at or below the A cutoff. If that item crosses the cutoff, it is assigned to B; the same boundary rule moves a B item into C when its inclusion takes the cumulative share above the B cutoff. This convention makes every item belong to exactly one class.
The rule can leave a class with no items when a large first item crosses a small threshold. Equal annual values retain input order in the runtime's stable sort, so items tied at a boundary can receive different classes depending on list order. If ties are material, adopt a tie policy—such as keeping equal-value items together—and apply it outside the calculator consistently rather than treating this sequential classification as that policy.
Worked examples
An item crosses the A cutoff
Inputs: Annual quantities [1,000, 130, 140, 20]; unit costs [$3, $25, $12, $100]; A=80%, B=95%.
Calculation: Annual values are $3,000, $3,250, $1,680, and $2,000; total=$9,930. In value order: item 2 reaches 32.73% (A); item 1 reaches 62.94% (A); item 4 reaches 83.08% (B); item 3 reaches 100.00% (C).
Item 4 moves to B because including its $2,000 value takes cumulative value above the 80% A threshold.
A tighter A threshold changes the middle class
Inputs: Annual quantities [600, 100, 100, 10]; unit costs [$5, $18, $13, $40]; A=70%, B=90%.
Calculation: Annual values are $3,000, $1,800, $1,300, and $400; total=$6,500. In value order, the cumulative shares are 46.15%, 73.85%, 93.85%, and 100.00%, giving classes A, B, C, and C.
The second item crosses the 70% A cutoff, and the third crosses the 90% B cutoff; each moves to the next class under the post-item rule.
Turn the ranking into a review plan
Inspect items nearest a class boundary before changing policy. A high-value A item might justify more frequent counts or tighter purchasing approval; B items may suit a regular review cadence. A C item can still need close control if a shortage would stop production. These are management choices, not calculator outputs.
The ranking is only as current as its inputs. Recalculate after meaningful changes in demand, unit cost, or the product mix, and compare the new classes with the prior list. A sudden jump can be a real purchasing change, a reporting-unit conversion, or a data error. Inspect the annual value of the affected item before changing policy, and keep exception notes for critical low-spend parts that would otherwise sit in C.
Check the result and know its limits
Audit by multiplying each quantity by its cost, summing, sorting descending, and dividing each running total by the grand total. The last share should be 100%. If not, check list lengths, omissions, period, and currency. Reordering should not change results except where equal values meet a threshold.
ABC classes do not predict demand, calculate safety stock, or guarantee a service level. A stable annual total can conceal erratic weekly demand, a long or uncertain replenishment lead time, or a single customer-critical part. Use the classification as a prioritization view and pair it with demand variability, lead time, substitutability, and consequences of shortage before changing stock settings.