Operations calculator guides
Explore 30 practical guides with worked examples, clear assumptions, and direct links to the calculators they explain.
Showing 1–12 of 30 articles
ABC Inventory Analysis: Classify Stock by Annual Value
Rank inventory by annual usage value, apply cumulative ABC thresholds, and understand what the classes can and cannot tell you.
Read articleEconomic Production Quantity: Plan a Batch Run Size
Estimate a production batch that balances setup and inventory holding costs when stock builds at a finite production rate.
Read articlePeriodic Review Inventory: Set an Order-Up-To Level
Calculate a target stock position across the review interval and lead time, then see the replenishment quantity implied by current inventory.
Read articleEOQ with Quantity Discounts: Compare Order Costs Across Price Breaks
Compare annual purchase, ordering, and holding costs when an all-units supplier discount starts at a minimum order quantity.
Read articleEOQ with Planned Backorders: Include Shortage Costs in Lot Sizing
Estimate an order quantity, peak inventory, and planned backlog when unmet demand is delayed rather than lost.
Read articleBasic Reorder Point: Calculate When to Reorder
Calculate expected demand during supplier lead time and understand when a basic reorder trigger needs a separate buffer.
Read articleEconomic Order Quantity: Find a Cost-Balancing Lot Size
Use annual demand, ordering cost, and unit-year holding cost to estimate the classical economic order quantity and its assumptions.
Read articleLead-Time Demand Standard Deviation: Measure Demand Spread
Estimate how independent daily demand variation combines across a fixed replenishment lead time.
Read articleReorder Point with Safety Stock: Set a Variability-Aware Trigger
Combine mean lead-time demand with a normal service-factor buffer for a fixed-lead-time replenishment trigger.
Read articleSafety Stock for Fixed Lead Time: Size the Buffer
Estimate a fixed-lead-time demand buffer from daily demand variation and a selected service factor.
Read articleErlang B Blocking Probability: Size a No-Wait Capacity
Estimate the share of calls or jobs turned away when every identical server is busy, then translate blocking probability into carried traffic.
Read articleErlang C Service Level: Estimate Queue Waits for a Staffed Team
Estimate waiting probability, average queue delay, occupancy, and the share answered within a target time for a pooled multi-server queue.
Read article