Project management calculator guides
Explore 12 practical guides with worked examples, clear assumptions, and direct links to the calculators they explain.
Showing 1–12 of 12 articles
Blocked Work Fraction: Measure Time Spent Waiting on a Blocker
Compare accumulated blocked time with elapsed work-item time for the same cohort, while keeping task counts and blocker causes separate.
Read articleProject Duration Variance: Compare Actual Time with a Baseline
Compare a completed project’s elapsed duration with its approved baseline using the same calendar and time-unit rules.
Read articleProject Cost Estimate Variance: Compare Final Cost with the Approved Estimate
Calculate the signed difference between final project cost and an approved estimate, with checks for scope, currency, contingency, and cost basis.
Read articleProject Change Request Approval Rate: Define the Decision Cohort
Calculate approved change requests as a share of decided requests and report pending items separately from the approval ratio.
Read articleProject Change Request Decision Time: Calculate Mean Calendar Days
Calculate the mean elapsed calendar days from change-request submission to a final decision and keep pending cases visible outside the completed cohort.
Read articleProject Risk Response On-Time Rate: Track Actions Due in a Cohort
Measure risk responses completed on or before their due date among actions due in the same reporting cohort, while keeping response effectiveness separate.
Read articleProject Crashing Cost Slope: Compare Cost per Time Saved
Calculate incremental direct cost per unit of activity duration reduced between normal and crash endpoints.
Read articlePERT Expected Duration: A Weighted Estimate from Three Times
Estimate an activity’s PERT expected duration by weighting the most-likely time more heavily than the optimistic and pessimistic bounds.
Read articlePERT Duration Variance: Quantifying a Three-Point Estimate
Calculate PERT activity-duration variance from the optimistic and pessimistic estimates using the conventional one-sixth range approximation.
Read articlePERT Duration Standard Deviation: Interpreting Time Uncertainty
Estimate a PERT activity’s duration standard deviation as one sixth of its optimistic-to-pessimistic range.
Read articlePERT Deadline Probability for a Fixed Path: A Normal Approximation
Estimate the probability that a fixed serial path finishes by a chosen deadline using PERT duration estimates and a normal approximation.
Read articlePERT Most-Likely Estimate Weight: Why the Middle Case Counts Four Times
Calculate the most-likely estimate’s weighted contribution, four sixths of M, in the standard PERT expected-duration formula.
Read article