What a planned backlog means in this model
A planned backorder is stockout demand recorded and filled later, not a lost sale. This assumes the customer waits for replenishment; cancellations and supplier switching need a lost-sales model.
The cycle alternates between positive on-hand inventory and a backlog. When a lot arrives, it first clears the outstanding shortage; remaining units become available stock. Demand then depletes that stock, and after it reaches zero, further demand accumulates as backorders until the next delivery. The calculation trades average inventory cost against the cost assigned to this waiting demand.
Keep demand and cost periods aligned
Enter D in units per year, K as the fixed currency cost per replenishment order, h as currency per unit per year held, and p as currency per backordered unit per year. All three cost rates must use the same currency and the same annual basis. For example, if holding cost is recorded monthly but the model uses annual demand, convert h to a yearly per-unit rate before entering it. The field labels identify this time basis explicitly.
The tool allows zero annual demand and returns zero lot, inventory, backlog, and relevant cost in that case; for a positive-demand case, order, holding, and backorder cost inputs must be positive. It assumes demand arrives at a constant rate and orders are received immediately. It does not include purchase spending when unit price is constant because purchase cost does not vary with the order quantity in this comparison.
Calculate the lot and split the cycle
The continuous optimum is Q*=√[(2KD/h)((h+p)/p)]. The cost term K·D/Q is annual ordering cost. Holding cost depends on the triangular on-hand inventory profile, while the shortage-cost term depends on the triangular backlog profile. A higher penalty p makes prolonged shortages expensive and shifts the optimal cycle toward more stock; a higher holding rate h encourages a larger share of the cycle to be carried as backlog.
At the optimum, the maximum on-hand level is Imax=Q·p/(h+p), and maximum backorder is Bmax=Q·h/(h+p). These two portions add to the cycle quantity. If h and p are positive, increasing p raises the stock share and lowers the backlog share; it does not simply multiply the entire lot by a fixed service-level factor. The output is a cost-minimizing result for the specified linear penalties, not a target fill rate.
Worked examples
Backorders are possible but costly
Inputs: D=1,200 units/year, K=$75/order, h=$6/unit/year, p=$24/backordered unit/year.
Calculation: Q*=√[(2×75×1,200/6)×(30/24)]=√37,500=193.65 units. Imax=193.65×24/30=154.92; Bmax=193.65×6/30=38.73. Annual ordering cost=$464.76, holding cost=$371.81, and backorder cost=$92.95; total=$929.52.
The modeled cycle reaches about 155 units on hand and about 39 units backordered; the backlog is an assumed planned delay, not a lost sale.
A higher holding rate increases the backlog share
Inputs: D=2,400 units/year, K=$50/order, h=$10/unit/year, p=$40/backordered unit/year.
Calculation: Q*=√[(2×50×2,400/10)×(50/40)]=√30,000=173.21 units. Imax=173.21×40/50=138.56; Bmax=173.21×10/50=34.64. Annual ordering, holding, and shortage costs are $692.82, $554.26, and $138.56, totaling $1,385.64.
The cycle still splits into stock and backlog, with a 4:1 maximum-inventory-to-backorder ratio set by p:h=40:10.
Interpret the cost components and waiting exposure
The tool reports annual relevant cost from ordering, holding, and backorder terms. The displayed peak backlog is not the average backlog: the idealized cycle rises and falls linearly, so average backlog over the entire cycle is lower than its maximum. The same distinction applies to on-hand inventory. Do not compare the peak directly with an annual cost as if every unit remained short for a full year.
A low shortage penalty can produce a large backlog even at the mathematical minimum. Translate the peak into units waiting and any contractual or safety consequence. The calculator does not estimate service outcomes; a low cost is not proof the backlog is acceptable.
Audit the assumptions before acting
Independently verify the lot by checking that it is positive for positive D and that Imax+Bmax=Q, allowing only rounding difference. Then calculate annual ordering cost K·D/Q, holding cost h·Imax²/(2Q), and backorder cost p·Bmax²/(2Q). Their sum should match the reported relevant cost. These checks also reveal a common mistake: using a one-time stockout fee as if it were a per-unit-per-year backlog rate.
The model excludes variable lead time, uncertain demand, discounts, capacity limits, lost sales, and nonlinear penalties. It assumes every backlog is filled and cost grows linearly with waiting time. If that does not fit, use this only as a scenario benchmark and model the missing constraints separately.