Acceptance sampling average outgoing quality calculator
Estimate average outgoing defect fraction under rectifying single-sample inspection. Enter your values to see the result and method.
inputs.
Related calculators
How to use this calculator
Estimate average outgoing defect fraction under rectifying single-sample inspection.
- Enter Incoming defect fraction, Sample size (n), Acceptance number (c), Lot size (N). Match the units shown beside each field and review the result together with the assumptions below.
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
When to use this measure
Estimate average outgoing defect fraction under rectifying single-sample inspection. It is useful when a team needs to estimate average outgoing quality for a sampling plan. This page’s result is distinct from the neighboring tools linked above because it applies the method described here to the stated inputs.
What each input means
The required inputs are Incoming defect fraction; Sample size (n); Acceptance number (c); Lot size (N). Use matching inspection periods and consistent definitions if comparing results over time.
- Incoming defect fraction: Incoming defect fraction is entered in the unit or format shown by the field label.
- Sample size (n): Sample size (n) is entered in the unit or format shown by the field label.
- Acceptance number (c): Acceptance number (c) is entered in the unit or format shown by the field label.
- Lot size (N): Lot size (N) is entered in the unit or format shown by the field label.
Formula and worked example
AOQ = p × P(accept lot) × (N − n) / N
For p=0.02, n=50, c=1, and N=1,000, P(accept)≈0.7358 and AOQ≈0.01398 (1.398%).
The example estimates long-run outgoing defect fraction for the stated lot and sampling plan; it does not guarantee the quality of an individual lot.
Assumptions and interpretation
This is an idealized rectifying inspection model: rejected lots are screened and defectives removed, sampled units are excluded from outgoing product, and lot sampling is approximated with a binomial model.
AOQ is the expected outgoing defect fraction after rectifying inspection under the stated plan. It is a long-run average, not the measured fraction in one accepted lot.
Reference: NIST/SEMATECH e-Handbook, choosing a sampling plan.
Frequently asked questions
What is rectifying inspection?
It assumes rejected lots receive screening and detected defectives are removed or replaced, which lowers outgoing defect fraction.
Does this predict one lot’s quality?
No. AOQ is a long-run average under the stated lot, sampling, and inspection assumptions.
Why is the sample size limited?
The calculator uses an exact binomial sum for a bounded sample size to keep browser calculations responsive.
How do I use the Acceptance sampling average outgoing quality calculator?
Enter Incoming defect fraction, Sample size (n), Acceptance number (c), Lot size (N). Match the units shown beside each field and review the result together with the assumptions below.
What is a worked example of Acceptance sampling average outgoing quality?
AOQ = p × P(accept lot) × (N − n) / N For p=0.02, n=50, c=1, and N=1,000, P(accept)≈0.7358 and AOQ≈0.01398 (1.398%). The example estimates long-run outgoing defect fraction for the stated lot and sampling plan; it does not guarantee the quality of an individual lot.
Read the calculation methodology and privacy policy.