How to use this calculator
Estimate direct staff time cost for one meeting or a repeated meeting series.
- Enter Number of attendees, Average labor cost per hour (currency/hour), Meeting duration (minutes), Number of meetings in the series. Match the units shown beside each field and review the result together with the assumptions below.
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
How this calculation works
Meeting labor cost is the scheduled attendee time multiplied by the average hourly labor cost. This estimate helps teams compare meeting formats and cadence; it does not assign a value to work that attendees might otherwise have completed.
Inputs and units
attendees— Number of attendees- Count participants whose time should be included.
hourlyCost— Average labor cost per hour (currency/hour)- Use wage-only or fully loaded cost consistently; do not mix definitions.
minutes— Meeting duration (minutes)- Scheduled length of one meeting.
meetings— Number of meetings in the series- Use 1 for a single meeting.
Formula
Cost per meeting = attendees × average hourly labor cost × meeting minutes ÷ 60; series cost = cost per meeting × number of meetings.
Method
Enter the average fully loaded hourly cost if you want benefits and employer costs included. Enter the attendee count, duration, and number of sessions in the series.
Worked example
Twelve attendees at an average $50 per hour for 12 minutes cost 12 × $50 × 12 ÷ 60 = $120 per meeting. Five such sessions cost $600 in direct attendee time.
Assumptions and limits
The result is a direct labor estimate based on the average rate supplied. It excludes preparation, follow-up, travel, room costs, opportunity cost, and differences among participants unless you include those separately in the average rate.
Frequently asked questions
Should I include the organizer?
Include every person whose scheduled time you want counted, including the organizer and note-taker.
What does fully loaded hourly cost mean?
It is an hourly labor estimate that may include employer-paid benefits and payroll costs in addition to wages. Use one consistent rate definition.
Does this measure whether the meeting was worthwhile?
No. It estimates direct attendee time cost only and does not measure decisions, outcomes, preparation, or opportunity cost.
How do I use the Meeting labor cost calculator?
Enter Number of attendees, Average labor cost per hour (currency/hour), Meeting duration (minutes), Number of meetings in the series. Match the units shown beside each field and review the result together with the assumptions below.
What is a worked example of Meeting labor cost?
Twelve attendees at an average $50 per hour for 12 minutes cost 12 × $50 × 12 ÷ 60 = $120 per meeting. Five such sessions cost $600 in direct attendee time.
Read our calculation methodology.