RAID rebuild duration with workload share calculator
Estimate RAID reconstruction duration from decimal terabytes, sustained reconstruction throughput, and the share available for rebuilding.
How to use this calculator
Estimate RAID reconstruction duration from decimal terabytes, sustained reconstruction throughput, and the share available for rebuilding.
- Enter Data to reconstruct (decimal TB), Sustained reconstruction rate (MB/s), Rate available to rebuild (%). Match the units shown beside each field and review the result together with the assumptions below.
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
How the RAID rebuild duration with workload share calculator works
Estimate RAID reconstruction duration from decimal terabytes, sustained reconstruction throughput, and the share available for rebuilding.
Inputs and units
- Data to reconstruct (decimal TB): Data actually reconstructed in decimal TB, not necessarily total usable array capacity.
- Sustained reconstruction rate (MB/s): Sustained reconstruction rate before applying the workload share, in decimal MB/s.
- Rate available to rebuild (%): Percentage of the entered rate available to rebuilding; greater than zero and at most 100.
Formula and method
hours = TB × 1,000,000 / (MB/s × rebuild share / 100) / 3,600
Worked example
8 TB at 150 MB/s with 60% available gives an effective 90 MB/s: 8,000,000/90/3,600 = 24.6914 hours.
Interpreting the result
This is a constant-throughput transfer estimate. A smaller workload share lengthens the rebuild even when drive throughput is unchanged.
Assumptions and limits
TB and MB are decimal units. This is not an array-specific completion prediction: controller throttling, parity work, retries, and concurrent workload can change throughput.
Frequently asked questions
Is 1 TB treated as 1,024 GB?
No. The conversion is decimal: 1 TB = 1,000,000 MB. Convert binary TiB/MiB measurements before using these fields.
Is the entered rate already throttled?
If it already measures actual rebuild throughput, use a 100% share to avoid reducing the rate twice.
How do I use the RAID rebuild duration with workload share calculator?
Enter Data to reconstruct (decimal TB), Sustained reconstruction rate (MB/s), Rate available to rebuild (%). Match the units shown beside each field and review the result together with the assumptions below.
What is a worked example of RAID rebuild duration with workload share?
8 TB at 150 MB/s with 60% available gives an effective 90 MB/s: 8,000,000/90/3,600 = 24.6914 hours.
What does the RAID rebuild duration with workload share calculator calculate?
Estimate RAID reconstruction duration from decimal terabytes, sustained reconstruction throughput, and the share available for rebuilding.
See the calculation methodology.