How to use this calculator
Estimate the expected number of plotted samples before a two-sided Shewhart chart signals.
- Enter Control limit half-width (standard errors), Process mean shift (process σ), Observations per subgroup. Match the units shown beside each field and review the result together with the assumptions below.
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
How this calculation works
Average run length (ARL) describes how many plotted samples a Shewhart chart is expected to receive before the first point crosses a control limit. For independent normal chart statistics, each sample has a signal probability determined by the limit width and the current process-mean shift; the run length is geometric.
Inputs and units
limitSigma— Control limit half-width (standard errors)- Distance from the center line to either control limit in standard errors of the plotted statistic.
meanShiftSigma— Process mean shift (process σ)- Signed shift from target in process standard deviations; the chart is two-sided.
subgroupSize— Observations per subgroup- Use 1 for an individuals chart; an X-bar chart uses its subgroup size.
Formula
δ_chart = δ_process√m; p_signal = Φ(−k−δ_chart) + 1−Φ(k−δ_chart); ARL = 1/p_signal.
Method
Convert a process-mean shift in process standard deviations to the chart-statistic scale by multiplying by the square root of subgroup size. Calculate the probability of crossing either control limit under the shifted normal distribution, then take its reciprocal. With no shift and ±3σ limits, the result is about 370.4 plotted samples.
Worked example
An individuals chart with ±3σ limits and no process shift has a two-sided signal probability of about 0.27% per point and an ARL of 370.40 plotted samples.
Assumptions and limits
Models a two-sided Shewhart chart with known, fixed control limits and independent normally distributed plotted statistics. It does not include estimated-limit uncertainty, Western Electric supplementary rules, autocorrelation, or CUSUM/EWMA memory.
Frequently asked questions
What does a high ARL mean?
For an in-control process, it means false signals are expected less often; after a real shift, a lower ARL means faster detection.
Why does subgroup size matter?
A process shift becomes larger relative to the standard error of a subgroup mean as the subgroup size increases.
Does this include Western Electric rules?
No. It estimates the one-point, two-sided Shewhart limit rule only.
How do I use the Shewhart Average Run Length Calculator?
Enter Control limit half-width (standard errors), Process mean shift (process σ), Observations per subgroup. Match the units shown beside each field and review the result together with the assumptions below.
What is a worked example of Shewhart Average Run Length?
An individuals chart with ±3σ limits and no process shift has a two-sided signal probability of about 0.27% per point and an ARL of 370.40 plotted samples.
Reference: technical reference. See our calculation methodology.