CalcWorldHub
Free online calculator · no signup

Spearman Brown test length prediction calculator

Predict reliability after multiplying test length by an entered factor under parallel-item assumptions.

4,000 tools
Spearman Brown test length prediction calculator — Current reliability, New length / current length and calculation method
Spearman Brown test length prediction calculator: inputs and calculation method.

How to use this calculator

Predict reliability after multiplying test length by an entered factor under parallel-item assumptions.

  1. Enter Current reliability, New length / current length. Match the units shown beside each field and review the result together with the assumptions below.
  2. Read the worked example below to check the expected input format and result.
  3. Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
Calculation guide

Spearman Brown test length prediction explained

Spearman Brown test length prediction0.8235
Spearman Brown test length prediction: 0.823529 in the worked scenario.

A numerical walkthrough

Current reliability = 0.7; New length / current length = 2.

  • Spearman Brown test length prediction: 0.823529

The model behind the numbers

f*r/(1+(f-1)*r)

Assumes added or removed items behave like the existing items; it is not evidence that a real redesigned test will satisfy the model.

What to enter

r — Current reliability
Current reliability.
f — New length / current length
New length / current length.

Interpreting the result

Assumes added or removed items behave like the existing items; it is not evidence that a real redesigned test will satisfy the model.

Frequently asked questions

Does doubling length double reliability?

No, gains diminish near one.

Can a shorter test be modeled?

Yes, enter a factor below one.

Can negative reliability be used?

Not in this prediction domain.

How do I use the Spearman Brown test length prediction calculator?

Enter Current reliability, New length / current length. Match the units shown beside each field and review the result together with the assumptions below.

What is a worked example of Spearman Brown test length prediction?

Current reliability = 0.7; New length / current length = 2. Spearman Brown test length prediction: 0.823529