Stockout probability estimate
Model the chance lead-time demand exceeds current inventory under a normal-demand assumption. Enter values to see a free estimate and method.
inputs.
Calculator
How to use this calculator
Estimate stockout probability when demand during supplier lead time may exceed inventory. Free normal-model calculator with assumptions.
- Enter Average daily demand, Daily demand standard deviation, Lead time, Available inventory. Match the units shown beside each field and review the result together with the assumptions below.
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
Estimate lead-time stockout risk under a normal-demand model
Estimate the probability that demand during a fixed supplier lead time exceeds current available inventory, assuming independent normal daily demand.
Inputs and units
- Average daily demand: Mean units sold per day.
- Daily demand standard deviation: Variation in units/day over the same demand process.
- Lead time: Fixed number of days replenishment takes.
- Available inventory: Units available to meet lead-time demand.
Formula and method
For mean daily demand μd, daily standard deviation σd, and lead time L, the lead-time mean is μdL and standard deviation is σd√L. The reported risk is P(DL > inventory) from the corresponding normal tail.
Worked example
With μd=20, σd=8, L=9 days, and 230 units: mean demand = 180, standard deviation = 24, z=(230−180)/24=2.083; the upper-tail risk is about 1.86%.
Interpreting the result
The result is a model-based probability for the entered horizon, not a guaranteed forecast. Increasing inventory lowers this modeled tail probability when the other inputs stay fixed.
Assumptions and limits
The model assumes independent normal daily demand and a fixed lead time. Intermittent, seasonal, skewed demand, changing suppliers, or variable lead times can materially change actual risk. A zero daily standard deviation is a valid deterministic limit.
Frequently asked questions
What does zero daily standard deviation mean?
Demand is treated as fixed at its mean, so the calculation becomes a deterministic comparison with available stock.
Why does the model use a normal distribution?
The selected method approximates the sum of independent daily demand with a normal distribution; it may not fit intermittent or highly skewed demand.
Is the percentage a guaranteed stockout forecast?
No. It is conditional on the model and input assumptions.
How do I use the Stockout probability estimate?
Enter Average daily demand, Daily demand standard deviation, Lead time, Available inventory. Match the units shown beside each field and review the result together with the assumptions below.
What is a worked example of Stockout probability estimate?
With μ d =20, σ d =8, L=9 days, and 230 units: mean demand = 180, standard deviation = 24, z=(230−180)/24=2.083; the upper-tail risk is about 1.86% .
Read the calculation methodology and privacy policy.
Sources
- NIST/SEMATECH Engineering Statistics Handbook: normal distribution — Supports the normal-distribution assumption used to convert the lead-time mean and standard deviation to an upper-tail probability.
Good calculators show their work.
CalcWorldHub is built around clear inputs and visible assumptions. Results are estimates for planning; check official sources or your provider’s terms when exact figures matter.