How to use this calculator
Measure supplier lots accepted after a final incoming-inspection decision.
- Enter Supplier lots accepted, Supplier lots with a final decision. Match the units shown beside each field and review the result together with the assumptions below.
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
How this calculation works
The observed supplier lot acceptance rate compares lots accepted with all lots receiving a final inspection disposition. Count each lot once and apply one acceptance rule to the same supplier and period.
Inputs and units
supplierLotsAccepted— Supplier lots accepted- Whole supplier lots that pass the final inspection rule.
supplierLotsDecided— Supplier lots with a final decision- Whole supplier lots accepted or rejected in the same cohort.
Formula
Supplier lot acceptance rate (%) = lots accepted after inspection ÷ lots with a final inspection decision × 100.
Method
Use final accepted or rejected lot decisions from the selected period. Exclude pending lots until a final disposition is recorded.
Worked example
Of 80 supplier lots with a final inspection decision, 75 are accepted. The observed acceptance rate is 93.75%, with 5 lots rejected.
Assumptions and limits
This observed rate is not the probability of accepting a lot under a sampling plan and does not represent the percent of individual units defect-free.
Frequently asked questions
Should pending lots count?
No. Include lots with a final accepted or rejected disposition only.
Is this an acceptance-sampling probability?
No. That probability depends on a sampling plan and defect assumptions; this is an observed cohort rate.
Can I compare suppliers?
Use the same inspection rule, lot definition, and reporting cohort.
How do I use the Supplier Lot Acceptance Rate Calculator?
Enter Supplier lots accepted, Supplier lots with a final decision. Match the units shown beside each field and review the result together with the assumptions below.
What is a worked example of Supplier Lot Acceptance Rate?
Of 80 supplier lots with a final inspection decision, 75 are accepted. The observed acceptance rate is 93.75%, with 5 lots rejected.
Read our calculation methodology.