Choose one time window for every input
Enter energy used in kWh, peak demand in kW, and period duration in hours. Energy and peak must cover the same start and end times. The energy field accepts zero or more, while peak demand and hours must be positive. A monthly energy total paired with a single day’s peak would not describe a valid load factor.
Average demand = kWh ÷ hours. Load factor (%) = average demand ÷ peak kW × 100, equivalently energy ÷ (peak × hours) × 100. EIA defines load factor as average load divided by peak load over a specified interval. This definition makes the interval part of the result, not a formatting detail.
Read the result as a shape of demand
A higher load factor means average demand is closer to the peak for the selected period; a lower value means the peak stands well above typical use. It does not mean the equipment ran at that percentage of nameplate capacity. The denominator is the observed peak, not the system’s rated capacity, and the statistic does not reveal when peaks occurred.
For 7,200 kWh over 720 hours and a 20 kW peak, average demand is 10 kW and load factor is 50%. The average-to-peak comparison can help a facility discuss demand management, but it cannot identify which load caused the peak or whether shifting it is operationally feasible.
Understand the runtime guard
The calculator rejects a load factor above 100% (with a small numeric tolerance) because an interval’s average should not exceed its maximum peak when both cover the same measure. If the entered values imply more than 100%, inspect units, duration, meter boundary, and peak interval before drawing a conclusion. The implementation returns a validation error; it does not silently cap the result.
Positive peak demand and duration prevent division by zero. Energy is nonnegative, and the structured fields limit the maximum input ranges. The tool’s output rounds average demand to three decimals and load factor to two. A value close to 100% may still be limited by meter resolution or an interval peak that does not align with the energy period.
Compare two period profiles
A second scenario uses 10,800 kWh over 720 hours and a 30 kW peak. Average demand is 15 kW, so the load factor is again 50%. The same ratio can arise from different scale and use: one customer may average 10 kW with a 20 kW peak, while another averages 15 kW with a 30 kW peak.
Compare load factors only after aligning period length and peak definitions. A rolling 15-minute demand peak paired with monthly energy has a different interpretation from an hourly maximum over a week. The number is useful for the chosen window and can change when the window changes even if the underlying building is the same.
Worked examples
One 30-day interval
Inputs: Energy 7,200 kWh; peak 20 kW; period 720 h.
Calculation: Average demand = 7,200 ÷ 720 = 10 kW; load factor = 7,200 ÷ (20 × 720) × 100 = 50%.
Average demand is 10 kW and load factor is 50.00% for this period.
Larger site at the same factor
Inputs: Energy 10,800 kWh; peak 30 kW; period 720 h.
Calculation: Average demand = 10,800 ÷ 720 = 15 kW; load factor = 10,800 ÷ (30 × 720) × 100 = 50%.
The site also has a 50.00% factor, despite higher average and peak demand.
Use the ratio with other evidence
Load factor does not forecast the next bill or directly give a demand charge. Tariffs may bill the highest demand in a selected window, apply ratchets, or use power factor; those rules need separate inputs. A high factor can still include an expensive peak, and a low factor does not identify whether a peak is avoidable.
Use interval data to locate peaks and pair this ratio with tariff information, operating schedules, and equipment constraints. The calculator is a descriptive screening metric. It does not evaluate system reliability, energy efficiency, utility planning, or savings, and a load factor should always be reported with the period and demand measurement method.