Compound channel divided conveyance and flow split calculator — Subsection areas (m²), Assigned wetted perimeters (m), Subsection Manning roughnesses and calculation method
Compound channel divided conveyance and flow split calculator: inputs and calculation method.

How to use this calculator

Estimate how a compound channel’s main channel and rough floodplains share discharge under a common energy slope.

  1. Enter Subsection areas (m²), Assigned wetted perimeters (m), Subsection Manning roughnesses, Common friction slope. Match the units shown beside each field and review the result together with the assumptions below.
  2. Read the worked example below to check the expected input format and result.
  3. Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
Calculation guide

Compound channel divided conveyance and flow split explained

Each subsection uses its own area, wetted perimeter, and Manning roughness to calculate conveyance. Summing the conveyances gives total discharge at the shared slope; each subsection’s share is its conveyance divided by the total.

Total divided-channel discharge16.8589m³/s
Total divided-channel discharge: 16.858938 m³/s in the worked scenario.

Inputs, symbols, and units

A — Subsection areas (m²)
Flow area of each nonoverlapping main-channel or floodplain subsection. Use comma-separated values in the stated order.
P — Assigned wetted perimeters (m)
Physical wetted perimeter assigned by the selected subdivision convention; imaginary internal boundaries are not automatically wetted walls. Use comma-separated values in the stated order.
n — Subsection Manning roughnesses
Positive SI roughness for each matching subsection. Use comma-separated values in the stated order.
S — Common friction slope
Shared energy slope assumed for all subsections.

Formula and method

Ki=Ai Ri^(2/3)/ni, Ri=Ai/Pi; Q=ΣKi√Sf; flow share i=Ki/ΣK.

Subdivide physical cross-section geometry before entry and state the perimeter convention. Simply averaging roughness coefficients would not preserve subsection conveyance.

A worked scenario

Subsection areas (m²) = [12, 8, 8]; Assigned wetted perimeters (m) = [8, 10, 10]; Subsection Manning roughnesses = [0.03, 0.06, 0.06]; Common friction slope = 0.0005.

  • Total divided-channel discharge: 16.858938 m³/s
  • First-subsection discharge: 11.720312 m³/s
  • First-subsection flow share: 69.519869 %
  • Total conveyance: 753.954646 m³/s per sqrt slope

A 12 m² main channel and two 8 m² floodplains use assigned perimeters 8, 10 and 10 m, roughnesses 0.03, 0.06 and 0.06, and common slope 0.0005.

Assumptions and edge cases

Quasi-one-dimensional parallel subsection conveyance, without lateral momentum exchange, secondary currents or floodplain storage. Educational model; this is not a code-compliant design check.

Reading the outputs

Total and first-subsection discharges are m³/s; first-subsection share is percent and total K is the proportionality constant between Q and square root slope.

Frequently asked questions

Can roughness simply be averaged?

Averaging n generally does not give the same total conveyance as summing the individual hydraulic contributions.

Should subdivision lines count in wetted perimeter?

Use the convention required by the selected method; an imaginary vertical interface is not automatically a physical wall.

Why is a flow share shown when slope is zero?

It is the potential conveyance fraction; the actual discharge is zero for all subsections at zero slope.

How do I use the Compound channel divided conveyance and flow split calculator?

Enter Subsection areas (m²), Assigned wetted perimeters (m), Subsection Manning roughnesses, Common friction slope. Match the units shown beside each field and review the result together with the assumptions below.

What is a worked example of Compound channel divided conveyance and flow split?

Subsection areas (m²) = [12, 8, 8]; Assigned wetted perimeters (m) = [8, 10, 10]; Subsection Manning roughnesses = [0.03, 0.06, 0.06]; Common friction slope = 0.0005. Total divided-channel discharge: 16.858938 m³/s First-subsection discharge: 11.720312 m³/s First-subsection flow share: 69.519869 % Total conveyance: 753.954646 m³/s per sqrt slope A 12 m² main channel and two 8 m² floodplains use assigned perimeters 8, 10 and 10 m, roughnesses 0.03, 0.06 and 0.06, and common slope 0.0005.