How to use this calculator
Compare level-production and chase-demand workforce plans across a sequence of period demands and entered costs.
- Enter Demand by period (units, comma or space separated), Units produced per worker per period, Starting workforce (FTE), Wage cost per worker per period, then complete the remaining labeled fields. Match the units shown beside each field and review the result together with the assumptions below.
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
How this calculation works
Aggregate planning compares production capacity, workforce changes, inventory, backorders, and plan costs across a medium-term horizon. A level plan keeps its workforce and production rate constant; a chase plan changes workforce to match each period’s demand.
Inputs and units
demand— Demand by period (units, comma or space separated)- Nonnegative demand values in chronological order; enter between 2 and 24 periods.
unitsPerWorker— Units produced per worker per period- Constant output capacity of one full-time-equivalent worker in each period.
startingWorkers— Starting workforce (FTE)- Workforce available immediately before the first period.
wage— Wage cost per worker per period- Cost per FTE for one period, in the same currency units as all other cost inputs.
hire— Hiring cost per added FTE- One-time cost for each FTE added at a period boundary.
layoff— Layoff cost per reduced FTE- One-time cost for each FTE removed at a period boundary.
holding— Inventory holding cost per unit per period- Cost charged on positive end-of-period inventory.
backorder— Backorder cost per unit per period- Cost charged on the magnitude of negative end-of-period inventory.
Formula
Level production per period = average demand. Chase workforce in period t = demandₜ ÷ units per worker per period. Plan cost = wages + hiring/layoff cost + ending inventory or backorder cost.
Method
The level plan produces the average demand in every period and carries resulting inventory or backlog. The chase plan produces each period’s demand exactly and adjusts fractional FTEs to match it. Both plans include wage and workforce-change costs.
Worked example
For period demands 80, 120, 100, and 140 units, productivity 10 units per FTE per period, starting workforce 10, wages 1,000 per FTE-period, hiring 300 per FTE, layoffs 200 per FTE, holding 3 per unit-period, and backorders 10 per unit-period, the level plan costs 44,540 and the chase plan costs 47,200. The level plan carries ending inventory of 30, 20, 30, and 0 units.
Assumptions and limits
This is a two-strategy comparison, not an optimizer. It assumes one product family, constant productivity, fractional FTEs, no initial inventory, no overtime or subcontracting, and immediate hiring or layoffs. Enter costs in consistent units; actual plans may include additional capacity and service constraints.
Frequently asked questions
What does the level plan hold constant?
It keeps the same workforce and output per period, using inventory or backorders to absorb demand variation.
What changes under a chase plan?
The modeled workforce changes each period so production matches that period’s demand.
Does this find the lowest possible aggregate plan?
No. It compares two pure strategies and does not optimize a hybrid plan.
How do I use the Level vs Chase Aggregate Production Plan Calculator?
Enter Demand by period (units, comma or space separated), Units produced per worker per period, Starting workforce (FTE), Wage cost per worker per period, then complete the remaining labeled fields. Match the units shown beside each field and review the result together with the assumptions below.
What is a worked example of Level vs Chase Aggregate Production Plan?
For period demands 80, 120, 100, and 140 units, productivity 10 units per FTE per period, starting workforce 10, wages 1,000 per FTE-period, hiring 300 per FTE, layoffs 200 per FTE, holding 3 per unit-period, and backorders 10 per unit-period, the level plan costs 44,540 and the chase plan costs 47,200. The level plan carries ending inventory of 30, 20, 30, and 0 units.
Reference: Operations Management aggregate planning method for level and chase plans. See our calculation methodology.