Cost performance index calculator
Measure earned value per unit of actual project cost. Enter the values below to calculate a clear estimate and see the method.
inputs.
How to use the Cost performance index calculator
CPI is earned value divided by actual cost for one reporting period and one consistent scope. It summarizes cost efficiency against the project's earned-value baseline.
Inputs and units
Use the same currency, work breakdown scope, and status date for both project amounts.
- Earned value (EV): Budgeted value of the work actually completed by the status date.
- Actual cost (AC): Cost incurred for that same completed work and status date; AC must be positive for CPI to be defined.
Formula and method
CPI = EV ÷ AC.
Enter earned value and actual cost for the same project and reporting period; a CPI of 1 means earned value equals cost.
Worked example
$52,000 EV divided by $55,000 AC gives CPI ≈ 0.9455.
Reading the result
CPI 0.9455 means about $0.9455 of earned value per $1 of actual cost. A value below 1 indicates cost efficiency below the baseline; it does not by itself predict final cost.
Assumptions and limitations
CPI below 1 indicates less earned value per cost unit than planned; consistent scope and accounting are essential.
Frequently asked questions
How do I calculate cost performance index?
CPI = EV ÷ AC. The worked example shows how the inputs map to the result.
Which units should I enter?
Use the units shown in the fields: Earned value (EV), Actual cost (AC). Do not mix periods or definitions.
What does a CPI below 1 indicate?
It indicates that earned value is below actual cost per unit on the selected scope and date. Check scope, cost coding, and the reporting baseline before drawing a forecast.
How do I use the Cost performance index calculator?
Use the same currency, work breakdown scope, and status date for both project amounts. Earned value (EV): Budgeted value of the work actually completed by the status date. Actual cost (AC): Cost incurred for that same completed work and status date; AC must be positive for CPI to be defined.
What is a worked example of Cost performance index?
$52,000 EV divided by $55,000 AC gives CPI ≈ 0.9455.
Read our calculation methodology and privacy policy.