How to use this calculator
Calculate a measured step response peak relative to its initial-to-final step change.
- Enter Initial steady output, Final steady output, First peak output in the step direction. Match the units shown beside each field and review the result together with the assumptions below.
- Read the worked example below to check the expected input format and result.
- Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
How this calculation works
Percent overshoot measures how far the first peak passes the final steady output, normalized by the size of the commanded output change. This step-amplitude normalization supports nonzero initial values and downward steps; enter the peak extremum in the direction of the step.
Inputs and units
initialOutput— Initial steady output- Measured output before the step, in the same unit as the other readings.
finalSteadyOutput— Final steady output- Measured final steady-state output after the step.
peakOutputInStepDirection— First peak output in the step direction- For an upward step enter the first maximum; for a downward step enter the first minimum beyond the final value.
Formula
Percent overshoot = max(0, (peak output − final steady output) ÷ (final steady output − initial output) × 100).
Method
Use values in one output unit from a settled step test. For an upward step, use the first maximum; for a downward step, use the first minimum beyond steady state.
Worked example
The output changes from 0 to a final steady value of 10 and reaches a first peak of 12. The peak exceeds steady state by 2 on a step size of 10, so percent overshoot is 20.00%.
Assumptions and limits
This is a measured response specification. Noise, saturation, multiple peaks, unstable responses, or a poorly chosen steady-state value can change the reported result.
Frequently asked questions
How is overshoot normalized for a nonzero starting value?
Divide the peak above the final value by the full initial-to-final step change.
How do I handle a downward step?
Enter the first minimum beyond the final value and retain the signed initial-to-final change in the formula.
Can overshoot be negative?
No. A response that does not pass beyond its final value reports zero overshoot.
How do I use the Percent Overshoot from Measured Step Response Calculator?
Enter Initial steady output, Final steady output, First peak output in the step direction. Match the units shown beside each field and review the result together with the assumptions below.
What is a worked example of Percent Overshoot from Measured Step Response?
The output changes from 0 to a final steady value of 10 and reaches a first peak of 12. The peak exceeds steady state by 2 on a step size of 10, so percent overshoot is 20.00%.
Reference: MathWorks overview of parallel and discrete PID controller forms. See our calculation methodology.