Project Change Request Approval Rate Calculator

Measure approved change requests as a share of decided requests in a project review cohort.

4,000 tools
Project Change Request Approval Rate Calculator — Approved change requests, Decided change requests and calculation method
Project Change Request Approval Rate Calculator: inputs and calculation method.

How to use this calculator

Measure approved change requests as a share of decided requests in a project review cohort.

  1. Enter Approved change requests, Decided change requests. Match the units shown beside each field and review the result together with the assumptions below.
  2. Read the worked example below to check the expected input format and result.
  3. Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
Project management calculation

How this calculation works

Change approval rate summarizes governance decisions on project change requests. Use requests that received a decision during the reporting period, count each request once, and keep pending requests out of the denominator.

Inputs and units

approvedRequests — Approved change requests
Whole change requests approved in the selected decision cohort.
decidedRequests — Decided change requests
Whole requests approved or rejected in the same decision cohort.

Formula

Displayed formula

Project change approval rate (%) = approved decided change requests ÷ all decided change requests × 100.

Method

Count approved and total decided requests for the same project and decision period. Decide in advance how withdrawn, superseded, and conditionally approved requests are handled.

Worked example

A project decides 24 change requests and approves 18. The approval rate is 75.00%, with 6 decided requests not approved.

Assumptions and limits

This ratio does not measure change quality, review speed, scope impact, or the share of submitted requests still pending. A high or low rate is not inherently good or bad.

Frequently asked questions

Do pending requests count?

No. The denominator includes only requests with a decision in the selected cohort.

How should conditional approvals be treated?

Apply the project’s governance rule consistently and document whether a conditional approval is final.

Does a high approval rate show good scope control?

Not on its own. Review the requests’ cost, schedule, risk, and strategic value as well.

How do I use the Project Change Request Approval Rate Calculator?

Enter Approved change requests, Decided change requests. Match the units shown beside each field and review the result together with the assumptions below.

What is a worked example of Project Change Request Approval Rate?

A project decides 24 change requests and approves 18. The approval rate is 75.00%, with 6 decided requests not approved.