Project Cost Estimate Variance Calculator

Compare actual project cost with an approved estimate using the same cost basis and currency.

4,000 tools
Project Cost Estimate Variance Calculator — Approved project cost estimate, Final actual project cost and calculation method
Project Cost Estimate Variance Calculator: inputs and calculation method.

How to use this calculator

Compare actual project cost with an approved estimate using the same cost basis and currency.

  1. Enter Approved project cost estimate, Final actual project cost. Match the units shown beside each field and review the result together with the assumptions below.
  2. Read the worked example below to check the expected input format and result.
  3. Compare another scenario by changing one input at a time. Use Reset to return to the starting values.
Project management calculation

How this calculation works

Project cost estimate variance compares a completed project’s actual cost with its approved estimate. Subtract the estimate from actual cost to show a signed overrun or underrun, then divide by the estimate to express the difference relative to the approved amount.

Inputs and units

estimatedProjectCost — Approved project cost estimate
Enter the approved estimate using the same scope, cost basis, and currency as the final actual cost.
actualProjectCost — Final actual project cost
Enter total actual cost for the matching completed project scope and cost basis.

Formula

Displayed formula

Cost variance = actual project cost − approved cost estimate; percent variance = (actual − estimate) ÷ estimate × 100.

Method

Enter the approved estimate and final actual cost for the same project scope, accounting basis, and currency. A positive result means actual cost exceeded the estimate; a negative result means it was lower.

Worked example

For a $100,000 approved estimate and $110,000 actual project cost, variance is +$10,000, or +10.00% of the estimate.

Assumptions and limits

This is a direct estimate-to-actual comparison, not earned-value cost variance, cost performance index, or an estimate-at-completion forecast. Scope changes and treatment of contingency, tax, and financing can affect comparability.

Frequently asked questions

What does a positive variance mean?

Actual project cost exceeded the approved estimate.

Can the variance be negative?

Yes. A negative result means actual cost was below the estimate.

Should contingency be included?

Use the same cost basis for estimate and actual, and state consistently whether contingency, tax, and financing are included.

How do I use the Project Cost Estimate Variance Calculator?

Enter Approved project cost estimate, Final actual project cost. Match the units shown beside each field and review the result together with the assumptions below.

What is a worked example of Project Cost Estimate Variance?

For a $100,000 approved estimate and $110,000 actual project cost, variance is +$10,000, or +10.00% of the estimate.